Project
Details
Client
Wilmar
Industry
Industrial & mining
Location
Mackay, Queensland
Completion
2022
PPI were engaged by Wilmar to provide Lightning Protection on the Mackay Bulk Sugar Terminal
PPI were engaged by Wilmar to provide the design, supply and installation of Lightning Protection on the Mackay Bulk Sugar Terminal.
Our scope included:
- Design of the Lightning Protection system using the Collection Volume Method (CVM).
- Removal and disposal of each existing systems, including downconductor cables, fixings.
- Fitting of new Stainless Steel mast assembly.
- Installation of new downconductor cable and Stainless Steel fastenings.
- Installation of new air terminal.
- Termination to recently renovated earthing point.
- Test and re-certification of the Lightning Protection system.
For further information on this project, please contact the team at sales@ppindustries.com.au