Mackay Bulk Sugar Terminal – Lightning Protection

Project
Details

Client

Wilmar

Industry

Industrial & mining

Location

Mackay, Queensland

Completion

2022

PPI were engaged by Wilmar to provide Lightning Protection on the Mackay Bulk Sugar Terminal

PPI were engaged by Wilmar to provide the design, supply and installation of Lightning Protection on the Mackay Bulk Sugar Terminal.

Our scope included:

  • Design of the Lightning Protection system using the Collection Volume Method (CVM).
  • Removal and disposal of each existing systems, including downconductor cables, fixings.
  • Fitting of new Stainless Steel mast assembly.
  • Installation of new downconductor cable and Stainless Steel fastenings.
  • Installation of new air terminal.
  • Termination to recently renovated earthing point.
  • Test and re-certification of the Lightning Protection system.

For further information on this project, please contact the team at sales@ppindustries.com.au

Get in touch with team PPI

    This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.